The outside square cut is the basis for all other cuts.
Roll roofing installation drip edge.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
This should give you a 1 inch overhang on the eaves including the top edge of.
Prepare roof edges cant strips.
Line up the edge of a sheet of roll roofing with the chalk line and roll the roofing across the entire length of the roof.
Drive nails every 3 inches along the rake at one end pull it taut and drive nails along the eave edge.
Depends what edge of the roof you are talking about.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
On the rake of a gable roof the drip edge metal goes over the paper as shown in the first drawing in the op link but on the eave the drip edge metal goes on first and then the paper over that.
Roll out and cut roll roofing to cover the length of the roof.
How to install a drip edge.
For extra protection add a 3 foot wide strip on top of the 18 incher.
The nails should be about 1 inch from the edges.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Step 8 nail the roofing down every 3 inches.
Secure the drip edge with roofing cement.
Place the top edge of the roofing along the chalk line.
Make sure the outer edge extends over the gutter.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
Walkthrough of the basic cut for drip edge installation on your roofing project.
An underlayment of felt roofing is optional.
Align the roofing with the chalk line and nail down the edge that runs along the drip edge working out any bubbles as you go.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
This will be your first course of roofing.
If it doesn t pull the drip edge out slightly from under the shingles.
You won t enjoy trying to lift up roll roofing to install a segment of flashing or drip edge that you forgot.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a distance of 8 feet or so.
Once you learn how t.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
The roofing should extend 1 inch beyond the drip edge.